Skip to content
Line Performance

Severn Beach line: live trains and performance

GWR · Bristol Temple Meads to Avonmouth and Severn Beach via Montpelier, Redland, Clifton Down, Sea Mills and Shirehampton · Updated 19 November 2026

Late on this line?

Railhop finds your train and what you're owed. GWR pays from 15 minutes late.

Your Journey

Live Now

Severn Beach line now

Live · updated 19:56, refreshes every 30 secondsGet Line Alerts
Good serviceGWR · checked 19:56

Trains on the Severn Beach line are running normally. 1 of the 2 trains on the line now are on time, and 1 has been cancelled earlier today.

Worked out from every train's live times at each station and National Rail's messages for these stations.

Planned works, next 7 daysNone plannedNational Rail's notices and the timetable to Thu 26 Nov.
Last trains tonight22:24 from Bristol Temple Meads · 23:08 from Severn BeachRunning as planned.

Trains on the line now

2 trains running. Where each train is comes from its live times at each station: tap one for its stops, a station for its next trains.

TOWARDS AVONMOUTH AND SEVERN BEACH →← TOWARDS BRISTOL

Bristol Temple Meads at the topNext train ↑ up ↓ down

  • ↓ 20:12
  • ↑ 20:14↓ 20:15
  • ↑ 20:11↓ 20:18
  • ↑ 20:06↓ 20:22
  • ↑ 20:03↓ 19:58
  • ↑ 20:00↓ 20:01
  • ↑ 19:54↓ 20:05
  • ↑ 20:17↓ 20:08
  • ↑ 20:15↓ 20:10
  • ↑ 20:12↓ 20:14
  • ↑ 20:07↓ 20:17
  • ↑ 20:01

On timeA few minutes late15+ min lateCancelled or 60+ min lateReplacement busChange hereSome trains only

On the line today

Incidents, cancellations, skipped stops and changes to the usual service. Station notices are National Rail's own words.

  • Cancelled: the 17:12 Bristol Temple Meads to AvonmouthReason given: a points failure. Next from Bristol Temple Meads: the 17:46, running 12 min late.

LaterShorter trains than usual and how busy each train is: Darwin sends these for some operators. Railhop has started storing them and shows them once the operator fills them in.

Today so far

Thursday 19 November, trains that have finished their journey by 19:56.

Trains so far56Both directions
On time58.9%33 of 56, within 3 minNormal weekday by now 55.0%
Cancelled1Fully cancelledNormal by now: fewer than 1
Late enough to claim815+ min late, cancelled or cut short

On time by hour, today against a normal weekday

Today, as good as normalToday, below normalNormal weekday (last 30 days)

  • Most late today: the 16:46 from Avonmouth36 min late into Weston-Super-Mare. Reason given: a points failure.
  • Right now: 1 running 5+ min late2 trains on the line.
On one of these trains? GWR pays from 15 minutes late.Check My Delay
Railhop's records for this line start on 14 October 2026.

Month by month

Every month since Railhop's records for this line began on 14 October 2026. The rest of the 12 months fill in as each month passes.

MonthTrainsOn timeCancelledLate enough to claim
November 202618 days recorded1,14861.1%0.8%5.1%
October 202618 days recorded1,19158.7%1.2%6.2%

Compared with nearby lines

Same measures.

Wessex Main LineGWR, South Western Railway
On time63.7%
Cancelled2.3%
All GWR
On time73.7%
Cancelled2.5%

Cancelled bars are drawn 10x so small shares show.

Timetable and planned works

December timetable (from Sunday 13 December): no change in the number of trains on this line.

Weekdays71No change
Saturdays70No change
Sundays28No change

Trains a day, both directions. Weekday first and last: Towards Avonmouth and Severn Beach 05:10 and 22:24; Towards Bristol 05:53 and 23:08.

Planned works

No planned works published for this line's stations. They appear here as soon as National Rail publishes them, with the replacement buses.

Delay Repay

Late on the Severn Beach line? You can claim

On a single ticket you get 25% of the fare for 15–29 minutes, 50% for 30–59 minutes, 100% for 60–119 minutes and 100% for 2 hours or more. On a return ticket: 12.5%, 25%, 50% and 100% of the return fare. Railhop checks your train and fills in GWR's form. You press submit.

For rail user groups

Run a group on this line? Use these figures.

Put the live line card on your website, download the figures for your newsletter or a council submission, or get your line's numbers by email each month. Each comes with a link back here. Already using them: Bristol Rail Campaign.

Line card, 560 × 440, shrinks to 320 wide
Line card snippet
<iframe src="https://railhop.app/embed/lines/severn-beach" width="560" height="440" style="border:0;max-width:100%" loading="lazy" title="Severn Beach line performance"></iframe>
<p><a href="https://railhop.app/lines/severn-beach">Severn Beach line performance</a> from Railhop</p>
Badge snippet
<a href="https://railhop.app/lines/severn-beach"><img src="https://railhop.app/lines/severn-beach/badge.png" width="300" height="96" alt="Severn Beach line: trains on time in the last 4 weeks, from Railhop"></a>

Both update every day and carry the National Rail credit. The line card's snippet ends with a plain link to this page: links inside a frame count for the frame's page, so the plain link is the one that tells search engines your site points here. No sign-up.

Open the CardOpen the Badge

Calculated by Railhop from National Rail Enquiries' Darwin data. Powered by National Rail Enquiries. Each train is measured on the Severn Beach line only, at the last station it calls at on the line in its direction of travel, so a train running on beyond the line isn't judged on what happens after it leaves. On time = arrived there within 3 minutes of the timetable (the industry's "Time to 3"), out of the trains whose arrival there was recorded. Cancelled = cancelled on the day at, or ran past, every station on the line it was due to call at. This is the official measure, which leaves out trains cancelled in advance (by 10pm the night before, the industry's "P-coded" cancellations, trains replaced by buses for planned works among them). We show those separately as cancelled in advance, and both together as all cancellations, out of every train in the timetable the evening before. Late enough to claim = 15+ minutes late arriving at that last station on the line, cancelled, or missed some of its stations on the line: Delay Repay is per journey, and the longest journey on the line ends there. GWR's own figures are its trains' whole journeys, as in the monthly Delay Report. How we count · Download CSV · All lines