Fen Line: live trains and performance
6 in 10 trains on the Fen Line ran on time in the last seven days (62.9%, within 3 minutes at their last station on the line), worse than Great Northern as a whole (71.2%). 3.6% were cancelled on the day, plus 2.9% cancelled in advance. Evening peaks are the weak spot.
Fen Line now
Trains on the Fen Line are running normally. 1 of the 4 trains on the line now are on time, and 19 have been cancelled earlier today.
Worked out from every train's live times at each station and National Rail's messages for these stations.
Trains on the line now
4 trains running. Where each train is comes from its live times at each station: tap one for its stops, a station for its next trains.
Cambridge at the topNext train ↑ up ↓ down
- ↓ 20:45
- ↑ 20:04↓ 20:49
- ↑ 19:59↓ 20:54
- ↑ 20:21↓ 20:05
- ↑ 20:12↓ 19:44
- ↑ 20:01↓ 19:55
- ↑ 19:54↓ 20:01
- ↑ 20:15
On timeA few minutes late15+ min lateCancelled or 60+ min lateReplacement busChange hereSome trains only
On the line today
Incidents, cancellations, skipped stops and changes to the usual service. Station notices are National Rail's own words.
- Cancelled: the 18:45 Kings Lynn to King's CrossReason given: a person being hit by a train earlier today. Next from Kings Lynn: the 19:14, running 3 min late.
- Cancelled: the 17:15 King's Cross to Kings LynnReason given: a person being hit by a train earlier today. Next from Cambridge: the 17:48, running 3 min late.
- Cancelled: the 16:45 Cambridge to Kings LynnReason given: a person being hit by a train earlier today. Next from Cambridge: the 17:48, running 3 min late.
LaterShorter trains than usual and how busy each train is: Darwin sends these for some operators. Railhop has started storing them and shows them once the operator fills them in.
Today so far
Thursday 19 November, trains that have finished their journey by 19:56.
On time by hour, today against a normal weekday
Today, as good as normalToday, below normalNormal weekday (last 30 days)
- Most late today: the 07:13 from KGX21 min late into Kings Lynn. Reason given: a late running freight train.
- Right now: 1 running 5+ min late4 trains on the line.
How reliable is the Fen Line?
Over the seven days to 18 November, 297 of 472 trains on the Fen Line reached their last station on the line within 3 minutes of time and 17 were cancelled on the day. Another 14 trains were cancelled in advance (by 10pm the night before), which the official figure leaves out: 6.4% of trains cancelled in all. That's worse than Great Northern overall. The worst day was Wednesday 18 November, when 4 of the day's 73 trains were cancelled.
Day by day
Every train each day, by how it ended. Taller red means more cancellations.
Worst days: Wed 18 Nov (4 cancelled, 2 cut short, 8 late enough to claim); Thu 12 Nov (4 cancelled, 1 cut short, 8 late enough to claim); Mon 16 Nov (3 cancelled, 10 cut short, 10 late enough to claim). Best day: Thu 12 Nov (65.8% on time).
When it goes wrong
By time of day, weekdays unless shown.
| Time | On time | Cancelled | Trains |
|---|---|---|---|
| Morning peakUntil 09:59 | 55% | 3.8% | 105 |
| Daytime10:00 to 15:59 | 55% | 7.5% | 120 |
| Evening peak16:00 to 19:59 | 55% | 1.3% | 75 |
| After 8pm20:00 to last train | 83% | 1.5% | 65 |
| WeekendsSat and Sun | 73% | 1.9% | 107 |
2 of the 17 cancellations were on weekdays after 4pm.
Station by station
How this line's trains ran at each stop. On time = within 3 minutes. Each name opens the station's live page.
| Station | Trains calling | On time | 15+ min late | Cancelled or skipped | Step-free | Ticket office |
|---|---|---|---|---|---|---|
| Cambridge | 472 | 64.8% | 33 | 18 | Later | Later |
| Cambridge North | 472 | 66.4% | 32 | 34 | Later | Later |
| Waterbeach | 472 | 69.6% | 28 | 34 | Later | Later |
| Ely | 472 | 69.9% | 29 | 34 | Later | Later |
| Littleport | 352 | 63.9% | 34 | 22 | Later | Later |
| Downham Market | 352 | 68.0% | 36 | 23 | Later | Later |
| Watlington | 351 | 68.7% | 39 | 21 | Later | Later |
| Kings Lynn | 351 | 71.0% | 53 | 22 | Later | Later |
LaterStep-free access, ticket office hours, car parks and toilets per station, from National Rail's station data. Not in Railhop yet.
Trains that let people down most
Weekday trains, ranked by how often they were cancelled or late enough to claim.
Weekday trains that ran at least 2 times in the period, ranked by how often they were cancelled or late enough to claim.
Why trains were late or cancelled
Reasons given by the railway for trains 5+ min late or cancelled (163 with a reason).
Delay Repay pays whatever the reason: a fault, the weather or someone taken ill on a train.
Compared with nearby lines
Same measures.
Cancelled bars are drawn 10x so small shares show.
Timetable and planned works
December timetable (from Sunday 13 December): the number of trains changes on this line.
Trains a day, both directions. Weekday first and last: Towards King's Lynn 05:42 and 00:18; Towards Cambridge and London 04:45 and 22:48.
Planned works
No planned works published for this line's stations. They appear here as soon as National Rail publishes them, with the replacement buses.
101 trains on this line were late enough to claim in the last seven days
On a single ticket you get 25% of the fare for 15–29 minutes, 50% for 30–59 minutes, 100% for 60–119 minutes and 100% for 2 hours or more. On a return ticket: 12.5%, 25%, 50% and 100% of the return fare. Railhop checks your train and fills in Great Northern's form. You press submit.
Run a group on this line? Use these figures.
Put the live line card on your website, download the figures for your newsletter or a council submission, or get your line's numbers by email each month. Each comes with a link back here. Already using them: Fen Line Users Association.
Fen Line
Great Northern · this period
<iframe src="https://railhop.app/embed/lines/fen-line" width="560" height="440" style="border:0;max-width:100%" loading="lazy" title="Fen Line performance"></iframe> <p><a href="https://railhop.app/lines/fen-line">Fen Line performance</a> from Railhop</p>
<a href="https://railhop.app/lines/fen-line"><img src="https://railhop.app/lines/fen-line/badge.png" width="300" height="96" alt="Fen Line: trains on time in the last 4 weeks, from Railhop"></a>
Both update every day and carry the National Rail credit. The line card's snippet ends with a plain link to this page: links inside a frame count for the frame's page, so the plain link is the one that tells search engines your site points here. No sign-up.
Calculated by Railhop from National Rail Enquiries' Darwin data. Powered by National Rail Enquiries. Each train is measured on the Fen Line only, at the last station it calls at on the line in its direction of travel, so a train running on beyond the line isn't judged on what happens after it leaves. On time = arrived there within 3 minutes of the timetable (the industry's "Time to 3"), out of the trains whose arrival there was recorded. Cancelled = cancelled on the day at, or ran past, every station on the line it was due to call at. This is the official measure, which leaves out trains cancelled in advance (by 10pm the night before, the industry's "P-coded" cancellations, trains replaced by buses for planned works among them). We show those separately as cancelled in advance, and both together as all cancellations, out of every train in the timetable the evening before. Late enough to claim = 15+ minutes late arriving at that last station on the line, cancelled, or missed some of its stations on the line: Delay Repay is per journey, and the longest journey on the line ends there. Great Northern's own figures are its trains' whole journeys, as in the monthly Delay Report. How we count · Download CSV · All lines