Skip to content
Line Performance

Cambrian line: live trains and performance

Transport for Wales · Shrewsbury to Aberystwyth via Welshpool, Newtown, Caersws, Machynlleth and Borth, with trains from Birmingham · Updated 19 November 2026

5 in 10 trains on the Cambrian line ran on time in October 2026 (54.7%, within 3 minutes at their last station on the line), worse than Transport for Wales as a whole (78.9%). 4.7% were cancelled on the day, plus 15.0% cancelled in advance. The middle of the day is the weak spot.

Late on this line?

Railhop finds your train and what you're owed. Transport for Wales pays from 15 minutes late.

Your Journey

Live Now

Cambrian line now

Live · updated 20:06, refreshes every 30 secondsGet Line Alerts
Bus replacementTransport for Wales · checked 20:06

Buses replace some trains on the line today.

Worked out from every train's live times at each station and National Rail's messages for these stations.

Buses nowNext from Newtown 20:12Bus times from the timetable; Railhop can't see where a bus is.
Planned works, next 7 daysFri 20 Nov: buses in the timetableFrom the timetable and National Rail's notices.
Last trains tonight21:50 from Shrewsbury · 23:39 from AberystwythRunning as planned.

Trains on the line now

3 trains running. Where each train is comes from its live times at each station: tap one for its stops, a station for its next trains.

TOWARDS ABERYSTWYTH →← TOWARDS SHREWSBURY

Shrewsbury at the topNext train ↑ up ↓ down

  • ↑ 21:00
  • ↑ 20:45↓ 20:07
  • ↑ 20:38↓ 20:15
  • ↑ 20:11↓ 20:49
  • ↑ 20:58↓ 20:57
  • ↑ 20:46↓ 20:05
  • ↑ 20:37↓ 20:11
  • ↑ 20:29

On timeA few minutes late15+ min lateCancelled or 60+ min lateReplacement busChange hereSome trains only

On the line today

Incidents, cancellations, skipped stops and changes to the usual service. Station notices are National Rail's own words.

  • No incidents on the line nowNo faults, cancellations or skipped stops reported since 04:41.
  • MachynllethSome journeys from Machynlleth are by bus every day.
  • AberystwythSome journeys from Aberystwyth are by bus every day.
  • MachynllethThe lifts serving platform 2 are currently out of order at Machynlleth station.Since 17 November

LaterShorter trains than usual and how busy each train is: Darwin sends these for some operators. Railhop has started storing them and shows them once the operator fills them in.

Today so far

Thursday 19 November, trains that have finished their journey by 20:06.

Trains so far17Both directions
On time88.2%15 of 17, within 3 minNormal weekday by now 63.1%
Cancelled0Fully cancelledNormal by now: fewer than 1
Late enough to claim015+ min late, cancelled or cut short

On time by hour, today against a normal weekday

Today, as good as normalToday, below normalNormal weekday (last 30 days)

  • Most late today: the 11:27 from Aberystwyth6 min late into BHI. Reason given: slippery rails.
  • Right now: 1 running 5+ min late3 trains on the line.
14 to 31 October 2026: 18 days Railhop has recorded for this line.
Trains run492Both directions, all stops
On time54.7%Within 3 minutes at its last station on the lineTransport for Wales 78.9%
Cancelled4.7%23 trains fully cancelledTransport for Wales 2.4%Plus 15.0% cancelled in advance (by 10pm the night before) on the days it's known. All cancellations: 19.3%
Late enough to claim22.3%109 trains, 15+ min late on the line, cancelled or stops missedTransport for Wales 10.2%
Short answer

How reliable is the Cambrian line?

In October 2026, 267 of 492 trains on the Cambrian line reached their last station on the line within 3 minutes of time and 23 were cancelled on the day. Another 76 trains were cancelled in advance (by 10pm the night before), which the official figure leaves out: 19.3% of trains cancelled in all. That's worse than Transport for Wales overall. The worst day was Tuesday 27 October, when 13 of the day's 32 trains were cancelled.

Day by day

Every train each day, by how it ended. Taller red means more cancellations.

On timeLate (4+ min)Cancelled or cut shortCancelled in advanceOct

Worst days: Tue 27 Oct (13 cancelled, 3 cut short, 2 late enough to claim); Wed 21 Oct (4 cancelled, 4 cut short, 6 late enough to claim); Sun 25 Oct (1 cancelled, 3 cut short, 7 late enough to claim). Best day: Mon 19 Oct (96.9% on time).

When it goes wrong

By time of day, weekdays unless shown.

TimeOn timeCancelledTrains
Morning peakUntil 09:5972%4.8%124
Daytime10:00 to 15:5944%4.1%98
Evening peak16:00 to 19:5947%5.1%78
After 8pm20:00 to last train51%7.9%63
WeekendsSat and Sun53%3.1%129
Towards Shrewsbury49.0%
Towards Aberystwyth60.3%

9 of the 23 cancellations were on weekdays after 4pm.

Station by station

How this line's trains ran at each stop. On time = within 3 minutes. Each name opens the station's live page.

StationTrains callingOn time15+ min lateCancelled or skippedStep-freeTicket office
Shrewsbury37856.8%4115LaterLater
Welshpool38858.7%4522LaterLater
Newtown38852.9%5723LaterLater
Caersws38851.0%5324LaterLater
Machynlleth49267.8%5029LaterLater
Dovey Junction48274.4%3846LaterLater
Borth48264.6%4645LaterLater
Bow Street48262.2%5145LaterLater
Aberystwyth48268.2%4846LaterLater

LaterStep-free access, ticket office hours, car parks and toilets per station, from National Rail's station data. Not in Railhop yet.

Trains that let people down most

Weekday trains, ranked by how often they were cancelled or late enough to claim.

18:30Shrewsbury to AberystwythWeekdays · 1 cancelled, 3 late enough to claim of 9 · avg 14.0 min late4 of 9
08:27Aberystwyth to ShrewsburyWeekdays · 2 cancelled, 1 cut short, 1 late enough to claim of 9 · avg 5.9 min late4 of 9
22:27Aberystwyth to MachynllethWeekdays · 1 cancelled, 2 late enough to claim of 7 · avg 8.7 min late3 of 7
20:29Aberystwyth to MachynllethWeekdays · 2 cancelled, 1 late enough to claim of 7 · avg 4.4 min late3 of 7
19:30Birmingham International to AberystwythWeekdays · 2 cut short, 2 late enough to claim of 11 · avg 9.8 min late4 of 11

Weekday trains that ran at least 5 times in the period, ranked by how often they were cancelled or late enough to claim.

Why trains were late or cancelled

Reasons given by the railway for trains 5+ min late or cancelled (178 with a reason).

Severe weather30
Train departing late to maintain customer connections20
Fault on a train earlier18
Fault with the signalling system14
Late running train being in front of this one14
Congestion10
More trains than usual needing repairs at the same time10

Delay Repay pays whatever the reason: a fault, the weather or someone taken ill on a train.

Compared with nearby lines

Same measures. Transport for Wales covers 2 Oct to 31 Oct.

Cambrian lineTransport for Wales
On time54.7%
Cancelled4.7%
Crewe to Shrewsbury lineTransport for Wales
On time60.4%
Cancelled1.2%
All Transport for Wales
On time78.9%
Cancelled2.4%

Cancelled bars are drawn 10x so small shares show.

Timetable and planned works

December timetable (from Sunday 13 December): the number of trains changes on this line.

Weekdays3513 more
Saturdays32No change
Sundays344 fewer

Trains a day, both directions. Weekday first and last: Towards Aberystwyth 04:41 and 21:50; Towards Shrewsbury 05:17 and 23:39.

Planned works

No planned works published for this line's stations. They appear here as soon as National Rail publishes them, with the replacement buses.

Delay Repay

109 trains on this line were late enough to claim in October 2026

On a single ticket you get 25% of the fare for 15–29 minutes, 50% for 30–59 minutes, 100% for 60–119 minutes and 100% for 2 hours or more. On a return ticket: 12.5%, 25%, 50% and 100% of the return fare. Railhop checks your train and fills in Transport for Wales's form. You press submit.

For rail user groups

Run a group on this line? Use these figures.

Put the live line card on your website, download the figures for your newsletter or a council submission, or get your line's numbers by email each month. Each comes with a link back here. Already using them: Shrewsbury-Aberystwyth Rail Passengers' Association.

Line card, 560 × 440, shrinks to 320 wide

Cambrian line

Transport for Wales · this period

Updated today
On time55%
Cancelled4.7%
Late enough to claim22.3%
Shrewsbury57%
Welshpool59%
Newtown53%
Caersws51%
Machynlleth68%
Line card snippet
<iframe src="https://railhop.app/embed/lines/cambrian" width="560" height="440" style="border:0;max-width:100%" loading="lazy" title="Cambrian line performance"></iframe>
<p><a href="https://railhop.app/lines/cambrian">Cambrian line performance</a> from Railhop</p>
Badge snippet
<a href="https://railhop.app/lines/cambrian"><img src="https://railhop.app/lines/cambrian/badge.png" width="300" height="96" alt="Cambrian line: trains on time in the last 4 weeks, from Railhop"></a>

Both update every day and carry the National Rail credit. The line card's snippet ends with a plain link to this page: links inside a frame count for the frame's page, so the plain link is the one that tells search engines your site points here. No sign-up.

Open the CardOpen the Badge

Calculated by Railhop from National Rail Enquiries' Darwin data. Powered by National Rail Enquiries. Each train is measured on the Cambrian line only, at the last station it calls at on the line in its direction of travel, so a train running on beyond the line isn't judged on what happens after it leaves. On time = arrived there within 3 minutes of the timetable (the industry's "Time to 3"), out of the trains whose arrival there was recorded. Cancelled = cancelled on the day at, or ran past, every station on the line it was due to call at. This is the official measure, which leaves out trains cancelled in advance (by 10pm the night before, the industry's "P-coded" cancellations, trains replaced by buses for planned works among them). We show those separately as cancelled in advance, and both together as all cancellations, out of every train in the timetable the evening before. Late enough to claim = 15+ minutes late arriving at that last station on the line, cancelled, or missed some of its stations on the line: Delay Repay is per journey, and the longest journey on the line ends there. Transport for Wales's own figures are its trains' whole journeys, as in the monthly Delay Report. How we count · Download CSV · All lines