Huddersfield line: live trains and performance
For Slaithwaite & Marsden Action on Rail Transport: Slaithwaite, Marsden first in the station table and the trains running now.
5 in 10 trains on the Huddersfield line ran on time in November 2026 (53.6%, within 3 minutes at their last station on the line), worse than TransPennine Express as a whole (59.4%). 0.7% were cancelled. Evening peaks are the weak spot.
Huddersfield line now
3 running 15+ minutes late.
Worked out from every train's live times at each station and National Rail's messages for these stations.
Trains on the line now
11 trains running. Where each train is comes from its live times at each station: tap one for its stops, a station for its next trains.
Manchester Piccadilly at the topNext train ↑ up ↓ down
- ↓ 19:58
- ↑ 20:40↓ 20:15
- ↑ 20:23↓ 20:13
- ↑ 20:17↓ 20:18
- ↑ 20:13↓ 20:22
- ↑ 20:05↓ 20:30
- ↑ 20:01↓ 20:34
- ↑ 19:49↓ 20:17
- ↑ 20:26↓ 19:57
- ↑ 20:15
On timeA few minutes late15+ min lateCancelled or 60+ min lateReplacement busChange hereSome trains only
On the line today
Incidents, cancellations, skipped stops and changes to the usual service. Station notices are National Rail's own words.
- Trains running between Manchester Piccadilly and Rose Hill Marple / New Mills Central may be cancelled out in full or revised to complete only part of the journeyTrains running between Manchester Piccadilly and Rose Hill Marple / New Mills Central may be cancelled out in full or revised to complete only part of the journey.Since 17 November
- Cancelled: the 14:45 Manchester Victoria to ScarboroughReason given: a fault on a train. Next from Manchester Victoria: the 15:00, running 44 min late.
- Cancelled: the 13:15 Scarborough to Manchester VictoriaReason given: a fault on a train. Next from Leeds: the 13:30, running 22 min late.
- Cancelled: the 11:00 Manchester Piccadilly to YorkReason given: a fault on a train. Next from Manchester Piccadilly: the 11:58.
- Manchester PiccadillySome journeys from Manchester Piccadilly are by bus every Thursday.
- StalybridgeSome journeys from Stalybridge are by bus every Thursday.
- MossleySome journeys from Mossley are by bus every Thursday.
- GreenfieldSome journeys from Greenfield are by bus every Thursday.
- MarsdenSome journeys from Marsden are by bus every Thursday.
- SlaithwaiteSome journeys from Slaithwaite are by bus every Thursday.
- DewsburySome journeys from Dewsbury are by bus every Thursday.
- DewsburySome lifts at this station are currently out of order.Since 5 October
LaterShorter trains than usual and how busy each train is: Darwin sends these for some operators. Railhop has started storing them and shows them once the operator fills them in.
Today so far
Thursday 19 November, trains that have finished their journey by 20:06.
On time by hour, today against a normal weekday
Today, as good as normalToday, below normalNormal weekday (last 30 days)
- Most late today: the 09:30 from NCL64 min late into LIV. Reason given: a fault on a train.
- Right now: 3 running 5+ min late11 trains on the line.
How reliable is the Huddersfield line?
In November 2026, 1,511 of 2,820 trains on the Huddersfield line reached their last station on the line within 3 minutes of time and 19 were cancelled. That's worse than TransPennine Express overall. The worst day was Tuesday 3 November, when 4 of the day's 180 trains were cancelled.
Day by day
Every train each day, by how it ended. Taller red means more cancellations.
Worst days: Tue 3 Nov (4 cancelled, 13 late enough to claim); Tue 10 Nov (3 cancelled, 28 late enough to claim); Tue 17 Nov (2 cancelled, 14 cut short, 26 late enough to claim). No trains ran on 2 days (14 Nov to 15 Nov). Best day: Wed 18 Nov (72.2% on time).
When it goes wrong
By time of day, weekdays unless shown.
| Time | On time | Cancelled | Trains |
|---|---|---|---|
| Morning peakUntil 09:59 | 48% | 0.9% | 696 |
| Daytime10:00 to 15:59 | 61% | 0.9% | 797 |
| Evening peak16:00 to 19:59 | 42% | 0.5% | 611 |
| After 8pm20:00 to last train | 60% | 0.0% | 257 |
| WeekendsSat and Sun | 61% | 0.7% | 459 |
3 of the 19 cancellations were on weekdays after 4pm.
Station by station
How this line's trains ran at each stop. On time = within 3 minutes. Each name opens the station's live page.
| Station | Trains calling | On time | 15+ min late | Cancelled or skipped | Step-free | Ticket office |
|---|---|---|---|---|---|---|
| MarsdenYour station | 788 | 57.3% | 54 | 4 | Later | Later |
| SlaithwaiteYour station | 788 | 53.8% | 56 | 4 | Later | Later |
| Manchester Piccadilly | 1,328 | 63.3% | 110 | 35 | Later | Later |
| Manchester Victoria | 1,979 | 63.4% | 166 | 26 | Later | Later |
| Stalybridge | 1,371 | 60.5% | 100 | 11 | Later | Later |
| Mossley | 774 | 48.0% | 49 | 17 | Later | Later |
| Greenfield | 774 | 49.5% | 48 | 10 | Later | Later |
| Huddersfield | 2,820 | 49.4% | 236 | 20 | Later | Later |
| Dewsbury | 1,129 | 57.5% | 87 | 15 | Later | Later |
| Leeds | 2,281 | 57.2% | 164 | 19 | Later | Later |
LaterStep-free access, ticket office hours, car parks and toilets per station, from National Rail's station data. Not in Railhop yet.
Trains that let people down most
Weekday trains, ranked by how often they were cancelled or late enough to claim.
Weekday trains that ran at least 5 times in the period, ranked by how often they were cancelled or late enough to claim.
Why trains were late or cancelled
Reasons given by the railway for trains 5+ min late or cancelled (884 with a reason).
Delay Repay pays whatever the reason: a fault, the weather or someone taken ill on a train.
Compared with nearby lines
Same measures.
Cancelled bars are drawn 10x so small shares show.
Timetable and planned works
December timetable (from Sunday 13 December): the number of trains changes on this line.
Trains a day, both directions. Weekday first and last: Towards Huddersfield and Leeds 05:30 and 22:24; Towards Manchester 05:45 and 22:15.
Planned works
No planned works published for this line's stations. They appear here as soon as National Rail publishes them, with the replacement buses.
338 trains on this line were late enough to claim in November 2026
On a single ticket you get 25% of the fare for 15–29 minutes, 50% for 30–59 minutes, 100% for 60–119 minutes and 100% for 2 hours or more. On a return ticket: 12.5%, 25%, 50% and 100% of the return fare. Railhop checks your train and fills in TransPennine Express's form. You press submit.
Run a group on this line? Use these figures.
Put the live line card on your website, download the figures for your newsletter or a council submission, or get your line's numbers by email each month. Each comes with a link back here. Already using them: Slaithwaite & Marsden Action on Rail Transport.
Huddersfield line
TransPennine Express · this period
<iframe src="https://railhop.app/embed/lines/huddersfield-line" width="560" height="440" style="border:0;max-width:100%" loading="lazy" title="Huddersfield line performance"></iframe> <p><a href="https://railhop.app/lines/huddersfield-line">Huddersfield line performance</a> from Railhop</p>
<a href="https://railhop.app/lines/huddersfield-line"><img src="https://railhop.app/lines/huddersfield-line/badge.png" width="300" height="96" alt="Huddersfield line: trains on time in the last 4 weeks, from Railhop"></a>
Both update every day and carry the National Rail credit. The line card's snippet ends with a plain link to this page: links inside a frame count for the frame's page, so the plain link is the one that tells search engines your site points here. No sign-up.
Calculated by Railhop from National Rail Enquiries' Darwin data. Powered by National Rail Enquiries. Each train is measured on the Huddersfield line only, at the last station it calls at on the line in its direction of travel, so a train running on beyond the line isn't judged on what happens after it leaves. On time = arrived there within 3 minutes of the timetable (the industry's "Time to 3"), out of the trains whose arrival there was recorded. Cancelled = cancelled on the day at, or ran past, every station on the line it was due to call at. This is the official measure, which leaves out trains cancelled in advance (by 10pm the night before, the industry's "P-coded" cancellations, trains replaced by buses for planned works among them). We show those separately as cancelled in advance, and both together as all cancellations, out of every train in the timetable the evening before. Late enough to claim = 15+ minutes late arriving at that last station on the line, cancelled, or missed some of its stations on the line: Delay Repay is per journey, and the longest journey on the line ends there. TransPennine Express's own figures are its trains' whole journeys, as in the monthly Delay Report. How we count · Download CSV · All lines